False Ceiling

We do false false ceiling for following:

  • LIVING ROOM CEILING
  • BED ROOM CEILING
  • KITCHEN
False Ceiling Pricing

PLASTER OF PARIS (FALSE CEILING RATE LIST.)

SR. DESCRIPTION RATE UNIT
1. P. O. P. plain ceiling with G .l. frame under. 60.00 Sft.
a) P.O.P PATTA 3? TO 6? 50.00 Rft.
2. India Gypsum board ceiling with G.I. frame under. 70.00 Sft.
a) GYSUM PATTA 3?TO 6? 60.00 Rft.
3. Gypsum board India section channel framing. 95.00 Sft.
4. P.O.P. Wall Punning 35.00 Sft.
5. Wall Taccha work 15.00 Sft.
6. Moulding 1?-3? 45.00 Rft.
7. Ceiling plaster 40.00 Sft.
8. Skirting groove 15.00 Rft.
9. Ceiling groove 20.00 Rft.
10. Marble flooring with plastic paper with p.o.p sheet 15.00 Sft.
11. Marble flooring with Paper with P.O.P sheet 18.00 Sft.
12. Spot ,Led Ceiling light gala cutting 35.00 Each
13. Tube light gala cutting 150.00 Each
14. PL Gala 75.00 Each
15. Making Dh?r moulding 35.00 Rft.
16. P.O.P sheet on ply partition 30.00 Sft.
17. Gypsum board on direct Ply Partition 45.00 Sft.
18. Gypsum partition in Regular Section 120.00 Sft.
19. Wall P.O.P. Stucco _India gypsum 35.00 Sft.
20. Helix board 8mm thickness. 160.00 Sft.
21. Helix board 10 mm thickness. 195.00 Sft.
22. Round ceiling. 250.00 Sft.




NOTE:

  • Client should provide water, electricity and storage place for the material.
  • Mishandling of the final furniture or material on site, breakage of glass items, sun mica, handles or misused will be paid by contractor at the same time.
  • Workers will work from 9am to 9pm if there is restriction in society for work than 15% will be added to total amount of bill executed.
  • Clean the site daily.
  • Any extra work rather than quotation the contractor must give quotation of extra work time to time before proceeding and get sanctioned.
  • Designing Charges will be extra.
  • Contractor have his supervisor at site.
  • Contractor Should Responsible to get work done as per design.
  • Any misbehavior on site will punish the contractor or any theft from site will bear to contractor only.
  • Work is not completed at time duration as per work order given by contractor then 15 % amount will be deducted from quotation amount
  • Contractor give the detail of workers like (name, phone no. , address proof).
  • On Site if society restrictions are issued than for 3hrs daily 10% extra and more than 4hrs 20% of total bill.


PAYMENT TERMS:

  • Payment as per Work Order As per Given Quotation.
  • Retention Amount will pay after One Months of actual job completed
  • Payment will be paid on Saturday as per payment schedule & measurement sheet approved.
  • AT TIME OF FINALIZATION OF WORKORDER 25% OF TOTAL COST.
  • AT TIME OF FRAMING CHECKING AND FINALIZATION 50% OF TOTAL COST.
  • AT TIME OF LIGHT GALA CUTTING AND FINALIZATION OF SITE COMPLETE PAYMENT AS PER BILL EXECUTED.